promptdojo_

Acceptance before the build — review against checks, not vibes — step 5 of 8

Three deliverables through the fixed gate — these are the verified records, after the review run. D-12's record holds two greens and silence about the third check: nobody ran it. D-13's record carries an extra entry (C4) the builder volunteered and nobody specced — does padding the record with green offset a recorded fail? What prints?